# Work Management

The plnx "Board - Calendar" month rebuilt from configuration alone: September 2026, Sunday first, the Hijri date beside every day (`showSecondaryDate` with `secondaryDateFormat: "day-month"`), Friday and Saturday hatched (`nonWorkingStyle: "hatch"`), National Day named on the 23rd (a `{ date, label, kind }` holiday), today as a filled circle on its number (`todayMarker: "number"`), each item a chip with a leading status dot (`eventMarker: "dot"` and an `eventTypes` map), a legend (`showLegend`) and a Gregorian / Hijri switch (`calendarSystemSwitch`, with `hijriEra` for the "1448 AH" title).

Items sit on their finish day; a multi-day item would take an `end` date and show a chip on every day it covers. Today is the real clock: the screenshots of this scenario pin it to 27 September 2026, the date of the plnx prototype.
